3D future installed at YARS
Master Sgt. Scott Obermiyer, aircraft structure maintenance craftsman, and Senior Airman Sabrina Baechel, aircraft structural maintenance helper, both assigned to the 910th Maintenance Squadron, install the first Advanced Additive Manufacturing part to be fitted on a C-130H Hercules aircraft, Aug. 5, 2019, on one of Youngstown Air Reserve Station’s C-130s. The installed part is a utility hydraulic panel, a high-wear, low-risk, non-flight essential part with a high replacement demand within the Air Force’s C-130 fleets. (U.S. Air Force photo/Senior Airman Christina Russo)